Summary page
Up ]

 

About
Earth/HRPT
Space
Arctic
Antarctica
Etna
GroundMap
Map to Geo
HRPT2004

Summary page of short term performance monitoring

 

For performance graphs of weeks, months and year refer to page Analysis and Analysis-2.

 

Left column:

Graphs pertaining to the SR-1 for Basic and High Volume Service-1 on the first Transponder of Eutelsat 10 east

Right column:

Graphs pertaining to the SR-1 for High Volume Service-2 on the second Transponder of Eutelsat 10 east

    Basic and HVS-1 on First Transponder on SR-1#1handled by PC Chukchi:               HVS-2 on Second Transponder on SR-1#4 handled by PC Qaanaaq:

EumetCast LAN:

Total of traffic handled by SR-1:                                                                                                       

House LAN:

Signal to Noise Ratio SR-1

Left => Dual Link Margin (Blue = HVS, Green = Basic Service)                                            Right: Single Link Margin

SR-1 Receiver level:

SR-1 Management port traffic:

Tellicast Basic Service Lost (blue) and Recovered (green) packets

Tellicast Basic Service Lost packets after recovery

Tellicast High Volume Service-1 Lost (blue) and Recovered (green) packets                            Right: High Volume Service-2

Tellicast High Volume Service-1 Lost packets after recovery                                                        Right: High Volume Service-2